Go back to main page

Return to Tower Oaks Development Info.Page


One Preserve Parkway Plans

[July 2005]

Boston Properties has submitted a Detailed CPD Application for this project which includes some modification since the first proposal.  Among changes are a reduction in building height (same number of floors, just not as tall) and different architectural treatment.  

For more information contact Damona Smith Strautmanis, Project Manager, 301-565-0844.

Front Elevation (2005 proposal, w/ measurement detail):

Compared to prior proposal/design (2001-3 proposal w/ measurement detail):

Site Plan:

 

CPD Master Plan for Boston Properties portion of Tower Oaks:

 


[Jan. 2003]

Boston Properties has announced plans to build an office building at the street address One Preserve Parkway, Ostensibly, this is the SE corner of Wootton and Preserve Parkways (entrance across the new road from the Clyde's driveway).

The present design for the building includes two additional stories (total of nine stories) beyond the CPD proposal for this particular parcel. The density allotment for the space of the additional stories is to be shifted from other un-built density within the CPD (and presumably from Boston Properties portion of the larger Tower Oaks tract). The density move and initial site plan was approved by the Mayor and Council by a 3 to 2 vote (the nay votes cited a lack of public notice and review of this change as a primary concern).

Front Elevation (2001-3 proposal):

Front Elevation
[Note: This view is approximately from the median of Preserve Parkway (in foreground), looking east, at the front of the building.]


Return to Tower Oaks Development Info.Page

Go back to main page

Copyright © 2003, Hungerford Civic Assoc.
Feedback
Last updated:
July 20, 2005.